How to Move Work Orders to a Different Route in PRO Software

Sometimes, work orders (WOs) need to be reassigned to a different route for better scheduling. PRO Software makes it easy to move WOs while maintaining efficiency. Follow these steps to transfer stops to a new or existing route.

Steps to Move Work Orders

  1. Open "Route Scheduling / Dispatching."
  2. Select the scheduled route that contains the work orders you want to move.
  3. Ensure you're in Dispatch View.
  4. Select the stops you want to move (you can choose one or multiple at once).
  5. Click "Move Order to Another Route."

Choosing a New or Existing Route

Once the move function is selected, you will have two options:

  • Option A: Assign the selected WOs to a new route (you can create a new route at this step).
  • Option B: Move the WOs to an existing route in the system.

Moving WOs to a Pre-Made Route

  1. Select the destination route from the dropdown menu.
  2. Choose an "Add After" option to determine the order in which these WOs will appear.
    • You can optimize and rearrange them later if needed.
  3. Click "Move to Another Route" to finalize the transfer.

PRO TIP

  • For active routes: Add WOs at the end of the route to avoid interfering with completed work orders.
  • For routes that haven't started yet: Add WOs anywhere and optimize the order afterward.

By following these steps, you can efficiently move work orders between routes while keeping your schedule organized and flexible.

Tags
How to Link a Driver to a Scheduled Route in PRO Software